Flexible UV-Resistant Self-Leveling Epoxy

SKU: FW-SLF-FLX

A crack-bridging, UV-stable self-leveling topcoat for sunlit areas and substrates with radiant floor heating.

Key Parameters

Finish
Semi-gloss
Thickness
3 mm
Coverage
1.8 kg/m²/mm
Mix Ratio
A:B = 3:1
Walk-on Time
8 h

Standard pack: 20 kg/set. Reply within 24 hours. Custom RAL colours and OEM packaging available.

  • ISO 9001
  • SGS
  • CE
  • PICC

System line:Self-Leveling Epoxy > Epoxy Self-Leveling

Why buyers specify it

A crack-bridging, UV-stable self-levelling topcoat for sunlit rooms and floors with radiant heating.

Product overview

A flexible, UV-stable self-levelling topcoat: 1.8 kg/m² per mm of build, poured at 3 mm, semi-gloss, mixed A:B = 3:1 out of a 20 kg set. That is about 5.4 kg/m² of material on a full 3 mm pour. It holds >75 Shore D with 60 MPa compressive and 42 MPa tensile, bonds at 3.2 MPa, wears at ≤0.03 g on the Taber plate, and measures 4 g/L VOC. Working windows: 35 minutes of pot life at 20 °C, walk-on at about 8 hours, light service from 24 hours, full cure at 7 days.

The trade this build makes

Read the hardness against our standard self-leveling epoxy and the difference is deliberate: that one is >80 Shore D at 80 MPa compressive, this one is >75 Shore D at 60 MPa. A film that gives a little is a film that can be stretched over a moving substrate instead of splitting when the substrate moves. Where a rigid 2 mm sheet locked straight to a slab is the build that shows hairline lines tracking along the heating runs, a crack-bridging coat is the one that keeps the surface continuous.

What we do not do is publish a cycle count for it. The softness is a real, measured property of the cured film; how many thermal cycles a particular slab will put on it depends on the slab, so the honest version of this claim is the mechanism plus the duty, not a number.

Where it is the right pick

Three situations, all of which are in the same building most of the time:

  • Over radiant heating. The features list carries radiant-heat-compatible because the film is expected to be warm most of the year and to change size twice a day. Switch the circuit down before the crew arrives and ramp it back slowly rather than going straight to set temperature.
  • In strong daylight. The topcoat is a UV-stable formulation, which means it resists the ambering a standard bisphenol epoxy shows under glazing light. It does not mean the colour is frozen; on a sunroom floor, a clear or warm-white build is the safer specification.
  • Over sound existing tile. Tile is a listed substrate here precisely because a crack-bridging film at 3 mm spans the joints instead of copying them, which is what a thin build tends to do.

Where it is the wrong pick

This is a comfort-and-light specification, not a duty specification. It carries no chemical-resistance claim, so a laboratory or wash-down bay belongs on one of our chemical-resistant builds. It is 3 mm and 60 MPa, so pallet traffic and forklift wheels are not its job. And it is an interior film: a balcony that sees weather needs a different topcoat conversation than a sunroom that sees glass.

What we need to quote it back correctly

Send the room size, the slab age and whether there is heating under it and at what temperature; the existing floor if there is one; and how much sun the room actually gets. From that we confirm the build, the colour and the set count — a 20 kg set covers a predictable area at 3 mm, and guessing the area is how projects end up short one set on day two.

Self-levelling epoxy is poured, not trowelled: the mixed two-component resin finds its own level, so the surface follows the beam line rather than the applicator's wrist. The result is a glass-smooth, joint-free floor with no texture to trap dust.

Because the material is self-de-airing only to a limit, the spiked-roller pass is not optional — it releases entrapped air and evens the film against the substrate's pinholes.

System build-up (typical, per m²)

Primer0.15–0.25 kg/m²Low-viscosity epoxy primer, rolled
Flexible topping1.8 kg/m² per mmA:B = 3:1, poured at 3 mm
UV-stable wear coat0.25 kg/m²Aliphatic topcoat for sunlit areas
Typical build3 mm

Rated features

  • flexible
  • UV-resistant
  • radiant-heat-compatible
  • waterproof
  • seamless
  • self-leveling
  • crack-bridging
  • low-VOC

Colour options

  • Clear
  • Light Grey
  • Warm White
  • Custom RAL

Custom RAL matching available — we ship a physical sample card before production.

Made in Our Own Factory

Dongguan Friway Hydraulic Control Technology Co., Ltd.

Every batch of Flexible UV-Resistant Self-Leveling Epoxy is produced in our own facility by a team that integrates R&D, production, sales and technical service. Advanced equipment, batch-level lab testing and a complete quality system mean consistent quality — from the first sample to the last pallet.

French A+ indoor air emission rating
French A+ Indoor Air — lowest emissions class
PICC product liability insurance
Product liability insured by PICC

Questions about production, certificates or MOQ?

Ask Our Team
  • ISO 9001Quality management system for the flooring coatings lineCertificate copy + audit scope on request
  • SGS testedAdhesion, hardness, abrasion and VOC on finished filmTest report per batch on request
  • CE / DoCDeclaration of conformity for European projectsDoC issued with shipment documents
  • French A+ VOCIndoor air-emission class for living-space floorsClassification sheet on request
  • PICC product liabilityProduct liability cover for exported goodsPolicy summary on request
  • MSDS / SDSPer component — needed for sea and air freight approvalIssued with every shipment

Certificates & Lab Reports

This product line is verified by third-party laboratories. The marks shown above are the ones we publish as images; the documents behind them — certificate copies, batch-specific test reports, the CE Declaration of Conformity — are issued on request. A scanned badge proves nothing about your slab; the report behind it does.

Request PDF Copies

Get a Free Quote

Need a Specification for Your Slab?

Send the floor area, substrate condition and what the room has to take. We reply with the system build-up, coverage estimate and an FOB quotation — usually within 24 hours.

  1. Tell us about the floorArea in m², substrate condition, and the finish or colour you want.
  2. Get a technician's replyWithin 24 hours: system build-up, coverage estimate, pricing and TDS/MSDS.
  3. Confirm colour & sampleFree colour chips and a cured sample panel before you place an order.

* Required fields. Your information is only used to respond to your inquiry.

Request a Quote

We reply within 24 hours

* Required fields. Your information is only used to respond to your inquiry.