Epoxy Colored Sand Installation — Stage by Stage

· Friway· 0:16

The four stages a colored-sand epoxy floor goes through: substrate prep, priming, broadcast and sealing.

Still images of the same four stages: grinding and vacuuming the slab, priming, broadcasting colored sand into the wet binder, then the sealing coat. The layer-by-layer build-up and the per-layer dosages are on each system page.

Get a Free Quote

Interested in What You See?

Want pricing, samples or a system recommendation for your project? Send us an inquiry and our team replies within 24 hours.

  1. Tell us about the floorArea in m², substrate condition, and the finish or colour you want.
  2. Get a technician's replyWithin 24 hours: system build-up, coverage estimate, pricing and TDS/MSDS.
  3. Confirm colour & sampleFree colour chips and a cured sample panel before you place an order.

* Required fields. Your information is only used to respond to your inquiry.

Request a Quote

We reply within 24 hours

* Required fields. Your information is only used to respond to your inquiry.