Why Chemistry Is the First QuestionA floor is its binder first. Solvent-free epoxy, cementitious mortar and a UV-stable topcoat behave differently on the same slab — and only two of them are ours to make.
Bigger Grain, More Grip, More ToleranceAggregate size decides three things at once: how the floor feels underfoot, how well it hides the slab, and how much effort a mop needs.
Matched From Your Code or a SampleColour matching starts at 5 sets: we send a wet film for approval before the batch runs, then keep the formulation on file for your reorders.
Each One Is a Formulation, Not a WordStatic control needs carbon and an earthing grid; grip needs grain; crack-bridging needs resin. Send the duty and we send the build-up that meets it.
Not Sure Which System?Send us the floor plan, substrate photo and traffic load — we recommend the system, build-up and layout within 24 hours.
Cured colour chips of your shortlisted systems, plus TDS and MSDS — free of charge; courier freight collect via DHL / UPS / FedEx, shipping at your cost.
Videos tagged with "Factory"
On the plant floor: reactor kettles and vacuum mixing on the mezzanine, the filling and labelling line, and the QC bench with its drying oven.
Cookies on this siteThis site uses Google Analytics to count visits. It loads only if you accept — everything else on the page works the same either way. Declining just means we stop asking.
We reply within 24 hours
* Required fields. Your information is only used to respond to your inquiry.